question re: supplier furnishing materials to fabricator's warehouse

AF
Andrea Fair
Thu, May 31, 2012 6:44 PM

I have a client who is a supplier.  He furnishes aluminum to a fabricator at the fabricator’s warehouse.  After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements.  My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC.  He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply).  However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.?  I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights.  Thank you all for your input.  -Andrea

Andrea M. Fair-Purcell
Board Certified Construction Attorney
▬▬▬▬▬▬▬▬▬▬▬▬
FAIR•LAW•PLLC
▬▬▬▬▬▬▬▬▬▬▬▬
13046 Racetrack Road #236
Tampa, FL 33626
(813) 412-1077 phone
(877) 879-4990 fax
www.fairconstructionliens.comhttp://www.fairconstructionliens.com

[cid:image001.jpg@01CD3F3A.9194BEF0]

The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.

I have a client who is a supplier. He furnishes aluminum to a fabricator at the fabricator’s warehouse. After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements. My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC. He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply). However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.? I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights. Thank you all for your input. -Andrea Andrea M. Fair-Purcell Board Certified Construction Attorney ▬▬▬▬▬▬▬▬▬▬▬▬ FAIR•LAW•PLLC ▬▬▬▬▬▬▬▬▬▬▬▬ 13046 Racetrack Road #236 Tampa, FL 33626 (813) 412-1077 phone (877) 879-4990 fax www.fairconstructionliens.com<http://www.fairconstructionliens.com> [cid:image001.jpg@01CD3F3A.9194BEF0] The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.
LL
Larry Leiby
Thu, May 31, 2012 7:07 PM

A Materialman who does not deliver to the site or sell for direct delivery to the site is not a materialman who has lien rights.  See F.S. 713.01 (20).  A materialman who sells to a fabricator with no understanding that the materials are for a specific site has a problem with the definition of a lienor.

Larry R. Leiby, Esq.
Malka & Kravitz, P.A.
1300 Sawgrass Corp. Pkwy., Suite 100
Ft. Lauderdale, FL  33323
Phone:  954-514-0984
Fax:      954-514-0985    e-mail:  leiby@mkpalaw.com

Board Certified in Construction Law
Fla. Supreme Court Certified Circuit Court Civil Mediator

Member, Leiby Alexander Brandt ADR Group, LLC
Member, JAMS Global Engineering and Construction Panel
Fellow, College of Commercial Arbitrators

[cid:image002.jpg@01CD3F3F.2106DD80]

From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair
Sent: Thursday, May 31, 2012 2:44 PM
To: clc-discussion@lists.flabarrpptl.org
Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse

I have a client who is a supplier.  He furnishes aluminum to a fabricator at the fabricator’s warehouse.  After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements.  My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC.  He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply).  However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.?  I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights.  Thank you all for your input.  -Andrea

Andrea M. Fair-Purcell
Board Certified Construction Attorney
▬▬▬▬▬▬▬▬▬▬▬▬
FAIR•LAW•PLLC
▬▬▬▬▬▬▬▬▬▬▬▬
13046 Racetrack Road #236
Tampa, FL 33626
(813) 412-1077 phone
(877) 879-4990 fax
www.fairconstructionliens.comhttp://www.fairconstructionliens.com

[cid:image003.jpg@01CD3F3F.2106DD80]

The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.

A Materialman who does not deliver to the site or sell for direct delivery to the site is not a materialman who has lien rights. See F.S. 713.01 (20). A materialman who sells to a fabricator with no understanding that the materials are for a specific site has a problem with the definition of a lienor. Larry R. Leiby, Esq. Malka & Kravitz, P.A. 1300 Sawgrass Corp. Pkwy., Suite 100 Ft. Lauderdale, FL 33323 Phone: 954-514-0984 Fax: 954-514-0985 e-mail: leiby@mkpalaw.com Board Certified in Construction Law Fla. Supreme Court Certified Circuit Court Civil Mediator Member, Leiby Alexander Brandt ADR Group, LLC Member, JAMS Global Engineering and Construction Panel Fellow, College of Commercial Arbitrators [cid:image002.jpg@01CD3F3F.2106DD80] From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair Sent: Thursday, May 31, 2012 2:44 PM To: clc-discussion@lists.flabarrpptl.org Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse I have a client who is a supplier. He furnishes aluminum to a fabricator at the fabricator’s warehouse. After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements. My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC. He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply). However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.? I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights. Thank you all for your input. -Andrea Andrea M. Fair-Purcell Board Certified Construction Attorney ▬▬▬▬▬▬▬▬▬▬▬▬ FAIR•LAW•PLLC ▬▬▬▬▬▬▬▬▬▬▬▬ 13046 Racetrack Road #236 Tampa, FL 33626 (813) 412-1077 phone (877) 879-4990 fax www.fairconstructionliens.com<http://www.fairconstructionliens.com> [cid:image003.jpg@01CD3F3F.2106DD80] The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.
GM
Gibbons, Michael
Thu, May 31, 2012 7:13 PM

Need to make sure that fabricator is responsible for installing the shutters (i.e., a subcontractor)  as well as supplying them to the jobsite so that your client has lien rights and is not a supplier to a supplier without lien rights.  Take a look at the definition of “materialman” at 713.01 as there may be an issue there as well on your facts.

Michael R. Gibbons  (Biohttp://lowndes-law.com/our-people/michael-r-gibbons)
Shareholder
Lowndes, Drosdick, Doster, Kantor & Reed, P.A.
450 South Orange Avenue, 8th Floor
Orlando, FL 32801
Phone: 407-418-6378
Fax: 407-843-4444
email: michael.gibbons@lowndes-law.commailto:michael.gibbons@lowndes-law.com
website: http://www.lowndes-law.comhttp://www.lowndes-law.com/

    [cid:image003.jpg@01CD3F3F.FAF34970]

From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair
Sent: Thursday, May 31, 2012 2:44 PM
To: clc-discussion@lists.flabarrpptl.org
Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse

I have a client who is a supplier.  He furnishes aluminum to a fabricator at the fabricator’s warehouse.  After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements.  My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC.  He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply).  However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.?  I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights.  Thank you all for your input.  -Andrea

Andrea M. Fair-Purcell
Board Certified Construction Attorney
▬▬▬▬▬▬▬▬▬▬▬▬
FAIR•LAW•PLLC
▬▬▬▬▬▬▬▬▬▬▬▬
13046 Racetrack Road #236
Tampa, FL 33626
(813) 412-1077 phone
(877) 879-4990 fax
www.fairconstructionliens.comhttp://www.fairconstructionliens.com

[cid:image001.jpg@01CC8816.941390B0]

The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.

This email message has been delivered safely and archived online by Mimecast.  For more information please visit http://www.mimecast.com

Need to make sure that fabricator is responsible for installing the shutters (i.e., a subcontractor) as well as supplying them to the jobsite so that your client has lien rights and is not a supplier to a supplier without lien rights. Take a look at the definition of “materialman” at 713.01 as there may be an issue there as well on your facts. Michael R. Gibbons (Bio<http://lowndes-law.com/our-people/michael-r-gibbons>) Shareholder Lowndes, Drosdick, Doster, Kantor & Reed, P.A. 450 South Orange Avenue, 8th Floor Orlando, FL 32801 Phone: 407-418-6378 Fax: 407-843-4444 email: michael.gibbons@lowndes-law.com<mailto:michael.gibbons@lowndes-law.com> website: http://www.lowndes-law.com<http://www.lowndes-law.com/> [cid:image003.jpg@01CD3F3F.FAF34970] From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair Sent: Thursday, May 31, 2012 2:44 PM To: clc-discussion@lists.flabarrpptl.org Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse I have a client who is a supplier. He furnishes aluminum to a fabricator at the fabricator’s warehouse. After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements. My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC. He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply). However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.? I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights. Thank you all for your input. -Andrea Andrea M. Fair-Purcell Board Certified Construction Attorney ▬▬▬▬▬▬▬▬▬▬▬▬ FAIR•LAW•PLLC ▬▬▬▬▬▬▬▬▬▬▬▬ 13046 Racetrack Road #236 Tampa, FL 33626 (813) 412-1077 phone (877) 879-4990 fax www.fairconstructionliens.com<http://www.fairconstructionliens.com> [cid:image001.jpg@01CC8816.941390B0] The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments. This email message has been delivered safely and archived online by Mimecast. For more information please visit http://www.mimecast.com
RP
Ryan P. Hatler
Thu, May 31, 2012 7:20 PM

Wouldn’t the affidavit she prepared and the process she describes below to have her client track the material to particular job sites be sufficient to satisfy the requirements of the statute?

From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby
Sent: Thursday, May 31, 2012 2:08 PM
To: Andrea Fair; clc-discussion@lists.flabarrpptl.org
Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse

A Materialman who does not deliver to the site or sell for direct delivery to the site is not a materialman who has lien rights.  See F.S. 713.01 (20).  A materialman who sells to a fabricator with no understanding that the materials are for a specific site has a problem with the definition of a lienor.

Larry R. Leiby, Esq.

Malka & Kravitz, P.A.

1300 Sawgrass Corp. Pkwy., Suite 100

Ft. Lauderdale, FL  33323

Phone:  954-514-0984

Fax:      954-514-0985    e-mail:  leiby@mkpalaw.com

Board Certified in Construction Law

Fla. Supreme Court Certified Circuit Court Civil Mediator

Member, Leiby Alexander Brandt ADR Group, LLC

Member, JAMS Global Engineering and Construction Panel

Fellow, College of Commercial Arbitrators

From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair
Sent: Thursday, May 31, 2012 2:44 PM
To: clc-discussion@lists.flabarrpptl.org
Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse

I have a client who is a supplier.  He furnishes aluminum to a fabricator at the fabricator’s warehouse.  After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements.  My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC.  He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply).  However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.?  I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights.  Thank you all for your input.  -Andrea

Andrea M. Fair-Purcell

Board Certified Construction Attorney

▬▬▬▬▬▬▬▬▬▬▬▬

FAIR•LAW•PLLC

▬▬▬▬▬▬▬▬▬▬▬▬

13046 Racetrack Road #236

Tampa, FL 33626
(813) 412-1077 phone

(877) 879-4990 fax
www.fairconstructionliens.com

The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.

Wouldn’t the affidavit she prepared and the process she describes below to have her client track the material to particular job sites be sufficient to satisfy the requirements of the statute? From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby Sent: Thursday, May 31, 2012 2:08 PM To: Andrea Fair; clc-discussion@lists.flabarrpptl.org Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse A Materialman who does not deliver to the site or sell for direct delivery to the site is not a materialman who has lien rights. See F.S. 713.01 (20). A materialman who sells to a fabricator with no understanding that the materials are for a specific site has a problem with the definition of a lienor. Larry R. Leiby, Esq. Malka & Kravitz, P.A. 1300 Sawgrass Corp. Pkwy., Suite 100 Ft. Lauderdale, FL 33323 Phone: 954-514-0984 Fax: 954-514-0985 e-mail: leiby@mkpalaw.com Board Certified in Construction Law Fla. Supreme Court Certified Circuit Court Civil Mediator Member, Leiby Alexander Brandt ADR Group, LLC Member, JAMS Global Engineering and Construction Panel Fellow, College of Commercial Arbitrators From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair Sent: Thursday, May 31, 2012 2:44 PM To: clc-discussion@lists.flabarrpptl.org Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse I have a client who is a supplier. He furnishes aluminum to a fabricator at the fabricator’s warehouse. After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements. My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC. He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply). However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.? I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights. Thank you all for your input. -Andrea Andrea M. Fair-Purcell Board Certified Construction Attorney ▬▬▬▬▬▬▬▬▬▬▬▬ FAIR•LAW•PLLC ▬▬▬▬▬▬▬▬▬▬▬▬ 13046 Racetrack Road #236 Tampa, FL 33626 (813) 412-1077 phone (877) 879-4990 fax www.fairconstructionliens.com The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.
LL
Larry Leiby
Thu, May 31, 2012 7:30 PM

I don’t have a case at the tip of my tongue but the words in the definition of materialman are what give me significant pause.  Tracking the materials down later does not seem to comport with the statute.  That is why suppliers put job sites on counter pick up orders.

Larry R. Leiby, Esq.
Malka & Kravitz, P.A.
1300 Sawgrass Corp. Pkwy., Suite 100
Ft. Lauderdale, FL  33323
Phone:  954-514-0984
Fax:      954-514-0985    e-mail:  leiby@mkpalaw.com

Board Certified in Construction Law
Fla. Supreme Court Certified Circuit Court Civil Mediator

Member, Leiby Alexander Brandt ADR Group, LLC
Member, JAMS Global Engineering and Construction Panel
Fellow, College of Commercial Arbitrators

[cid:image001.jpg@01CD3F42.56FDAFB0]

From: Ryan P. Hatler [mailto:rhatler@cphlaw.com]
Sent: Thursday, May 31, 2012 3:21 PM
To: Larry Leiby; Andrea Fair; clc-discussion@lists.flabarrpptl.org
Subject: RE: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse

Wouldn’t the affidavit she prepared and the process she describes below to have her client track the material to particular job sites be sufficient to satisfy the requirements of the statute?

From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby
Sent: Thursday, May 31, 2012 2:08 PM
To: Andrea Fair; clc-discussion@lists.flabarrpptl.org
Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse

A Materialman who does not deliver to the site or sell for direct delivery to the site is not a materialman who has lien rights.  See F.S. 713.01 (20).  A materialman who sells to a fabricator with no understanding that the materials are for a specific site has a problem with the definition of a lienor.

Larry R. Leiby, Esq.
Malka & Kravitz, P.A.
1300 Sawgrass Corp. Pkwy., Suite 100
Ft. Lauderdale, FL  33323
Phone:  954-514-0984
Fax:      954-514-0985    e-mail:  leiby@mkpalaw.commailto:leiby@mkpalaw.com

Board Certified in Construction Law
Fla. Supreme Court Certified Circuit Court Civil Mediator

Member, Leiby Alexander Brandt ADR Group, LLC
Member, JAMS Global Engineering and Construction Panel
Fellow, College of Commercial Arbitrators

[cid:image001.jpg@01CD3F42.56FDAFB0]

From: clc-discussion-bounces@lists.flabarrpptl.orgmailto:clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair
Sent: Thursday, May 31, 2012 2:44 PM
To: clc-discussion@lists.flabarrpptl.orgmailto:clc-discussion@lists.flabarrpptl.org
Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse

I have a client who is a supplier.  He furnishes aluminum to a fabricator at the fabricator’s warehouse.  After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements.  My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC.  He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply).  However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.?  I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights.  Thank you all for your input.  -Andrea

Andrea M. Fair-Purcell
Board Certified Construction Attorney
▬▬▬▬▬▬▬▬▬▬▬▬
FAIR•LAW•PLLC
▬▬▬▬▬▬▬▬▬▬▬▬
13046 Racetrack Road #236
Tampa, FL 33626
(813) 412-1077 phone
(877) 879-4990 fax
www.fairconstructionliens.comhttp://www.fairconstructionliens.com

[cid:image002.jpg@01CD3F42.56FDAFB0]

The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.

I don’t have a case at the tip of my tongue but the words in the definition of materialman are what give me significant pause. Tracking the materials down later does not seem to comport with the statute. That is why suppliers put job sites on counter pick up orders. Larry R. Leiby, Esq. Malka & Kravitz, P.A. 1300 Sawgrass Corp. Pkwy., Suite 100 Ft. Lauderdale, FL 33323 Phone: 954-514-0984 Fax: 954-514-0985 e-mail: leiby@mkpalaw.com Board Certified in Construction Law Fla. Supreme Court Certified Circuit Court Civil Mediator Member, Leiby Alexander Brandt ADR Group, LLC Member, JAMS Global Engineering and Construction Panel Fellow, College of Commercial Arbitrators [cid:image001.jpg@01CD3F42.56FDAFB0] From: Ryan P. Hatler [mailto:rhatler@cphlaw.com] Sent: Thursday, May 31, 2012 3:21 PM To: Larry Leiby; Andrea Fair; clc-discussion@lists.flabarrpptl.org Subject: RE: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse Wouldn’t the affidavit she prepared and the process she describes below to have her client track the material to particular job sites be sufficient to satisfy the requirements of the statute? From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby Sent: Thursday, May 31, 2012 2:08 PM To: Andrea Fair; clc-discussion@lists.flabarrpptl.org Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse A Materialman who does not deliver to the site or sell for direct delivery to the site is not a materialman who has lien rights. See F.S. 713.01 (20). A materialman who sells to a fabricator with no understanding that the materials are for a specific site has a problem with the definition of a lienor. Larry R. Leiby, Esq. Malka & Kravitz, P.A. 1300 Sawgrass Corp. Pkwy., Suite 100 Ft. Lauderdale, FL 33323 Phone: 954-514-0984 Fax: 954-514-0985 e-mail: leiby@mkpalaw.com<mailto:leiby@mkpalaw.com> Board Certified in Construction Law Fla. Supreme Court Certified Circuit Court Civil Mediator Member, Leiby Alexander Brandt ADR Group, LLC Member, JAMS Global Engineering and Construction Panel Fellow, College of Commercial Arbitrators [cid:image001.jpg@01CD3F42.56FDAFB0] From: clc-discussion-bounces@lists.flabarrpptl.org<mailto:clc-discussion-bounces@lists.flabarrpptl.org> [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair Sent: Thursday, May 31, 2012 2:44 PM To: clc-discussion@lists.flabarrpptl.org<mailto:clc-discussion@lists.flabarrpptl.org> Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse I have a client who is a supplier. He furnishes aluminum to a fabricator at the fabricator’s warehouse. After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements. My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC. He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply). However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.? I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights. Thank you all for your input. -Andrea Andrea M. Fair-Purcell Board Certified Construction Attorney ▬▬▬▬▬▬▬▬▬▬▬▬ FAIR•LAW•PLLC ▬▬▬▬▬▬▬▬▬▬▬▬ 13046 Racetrack Road #236 Tampa, FL 33626 (813) 412-1077 phone (877) 879-4990 fax www.fairconstructionliens.com<http://www.fairconstructionliens.com> [cid:image002.jpg@01CD3F42.56FDAFB0] The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.
FB
Fred Barnes
Thu, May 31, 2012 7:59 PM

This is definitely one that calls for Barry Kalmanson to weigh in, but he’s on vacation.

FREDERICK C. BARNES, ESQ.

500 North Maitland Avenue, Suite 305

Maitland, Florida  32751

Telephone:  407-865-9200

Facsimile:  407-865-9209

mailto:www.fcbarneslaw.com www.fcbarneslaw.com

From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby
Sent: Thursday, May 31, 2012 3:31 PM
To: Ryan P. Hatler; Andrea Fair; clc-discussion@lists.flabarrpptl.org
Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse

I don’t have a case at the tip of my tongue but the words in the definition of materialman are what give me significant pause.  Tracking the materials down later does not seem to comport with the statute.  That is why suppliers put job sites on counter pick up orders.

Larry R. Leiby, Esq.

Malka & Kravitz, P.A.

1300 Sawgrass Corp. Pkwy., Suite 100

Ft. Lauderdale, FL  33323

Phone:  954-514-0984

Fax:      954-514-0985    e-mail:  leiby@mkpalaw.com

Board Certified in Construction Law

Fla. Supreme Court Certified Circuit Court Civil Mediator

Member, Leiby Alexander Brandt ADR Group, LLC

Member, JAMS Global Engineering and Construction Panel

Fellow, College of Commercial Arbitrators

Description: JAMSadr.com.jpg

From: Ryan P. Hatler [mailto:rhatler@cphlaw.com]
Sent: Thursday, May 31, 2012 3:21 PM
To: Larry Leiby; Andrea Fair; clc-discussion@lists.flabarrpptl.org
Subject: RE: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse

Wouldn’t the affidavit she prepared and the process she describes below to have her client track the material to particular job sites be sufficient to satisfy the requirements of the statute?

From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby
Sent: Thursday, May 31, 2012 2:08 PM
To: Andrea Fair; clc-discussion@lists.flabarrpptl.org
Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse

A Materialman who does not deliver to the site or sell for direct delivery to the site is not a materialman who has lien rights.  See F.S. 713.01 (20).  A materialman who sells to a fabricator with no understanding that the materials are for a specific site has a problem with the definition of a lienor.

Larry R. Leiby, Esq.

Malka & Kravitz, P.A.

1300 Sawgrass Corp. Pkwy., Suite 100

Ft. Lauderdale, FL  33323

Phone:  954-514-0984

Fax:      954-514-0985    e-mail:  leiby@mkpalaw.com

Board Certified in Construction Law

Fla. Supreme Court Certified Circuit Court Civil Mediator

Member, Leiby Alexander Brandt ADR Group, LLC

Member, JAMS Global Engineering and Construction Panel

Fellow, College of Commercial Arbitrators

Description: JAMSadr.com.jpg

From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair
Sent: Thursday, May 31, 2012 2:44 PM
To: clc-discussion@lists.flabarrpptl.org
Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse

I have a client who is a supplier.  He furnishes aluminum to a fabricator at the fabricator’s warehouse.  After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements.  My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC.  He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply).  However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.?  I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights.  Thank you all for your input.  -Andrea

Andrea M. Fair-Purcell

Board Certified Construction Attorney

▬▬▬▬▬▬▬▬▬▬▬▬

FAIR•LAW•PLLC

▬▬▬▬▬▬▬▬▬▬▬▬

13046 Racetrack Road #236

Tampa, FL 33626
(813) 412-1077 phone

(877) 879-4990 fax
www.fairconstructionliens.com

cid:image001.jpg@01CC8816.941390B0

The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.

This is definitely one that calls for Barry Kalmanson to weigh in, but he’s on vacation. FREDERICK C. BARNES, ESQ. 500 North Maitland Avenue, Suite 305 Maitland, Florida 32751 Telephone: 407-865-9200 Facsimile: 407-865-9209 <mailto:www.fcbarneslaw.com> www.fcbarneslaw.com From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby Sent: Thursday, May 31, 2012 3:31 PM To: Ryan P. Hatler; Andrea Fair; clc-discussion@lists.flabarrpptl.org Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse I don’t have a case at the tip of my tongue but the words in the definition of materialman are what give me significant pause. Tracking the materials down later does not seem to comport with the statute. That is why suppliers put job sites on counter pick up orders. Larry R. Leiby, Esq. Malka & Kravitz, P.A. 1300 Sawgrass Corp. Pkwy., Suite 100 Ft. Lauderdale, FL 33323 Phone: 954-514-0984 Fax: 954-514-0985 e-mail: leiby@mkpalaw.com Board Certified in Construction Law Fla. Supreme Court Certified Circuit Court Civil Mediator Member, Leiby Alexander Brandt ADR Group, LLC Member, JAMS Global Engineering and Construction Panel Fellow, College of Commercial Arbitrators Description: JAMSadr.com.jpg From: Ryan P. Hatler [mailto:rhatler@cphlaw.com] Sent: Thursday, May 31, 2012 3:21 PM To: Larry Leiby; Andrea Fair; clc-discussion@lists.flabarrpptl.org Subject: RE: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse Wouldn’t the affidavit she prepared and the process she describes below to have her client track the material to particular job sites be sufficient to satisfy the requirements of the statute? From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby Sent: Thursday, May 31, 2012 2:08 PM To: Andrea Fair; clc-discussion@lists.flabarrpptl.org Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse A Materialman who does not deliver to the site or sell for direct delivery to the site is not a materialman who has lien rights. See F.S. 713.01 (20). A materialman who sells to a fabricator with no understanding that the materials are for a specific site has a problem with the definition of a lienor. Larry R. Leiby, Esq. Malka & Kravitz, P.A. 1300 Sawgrass Corp. Pkwy., Suite 100 Ft. Lauderdale, FL 33323 Phone: 954-514-0984 Fax: 954-514-0985 e-mail: leiby@mkpalaw.com Board Certified in Construction Law Fla. Supreme Court Certified Circuit Court Civil Mediator Member, Leiby Alexander Brandt ADR Group, LLC Member, JAMS Global Engineering and Construction Panel Fellow, College of Commercial Arbitrators Description: JAMSadr.com.jpg From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair Sent: Thursday, May 31, 2012 2:44 PM To: clc-discussion@lists.flabarrpptl.org Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse I have a client who is a supplier. He furnishes aluminum to a fabricator at the fabricator’s warehouse. After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements. My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC. He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply). However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.? I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights. Thank you all for your input. -Andrea Andrea M. Fair-Purcell Board Certified Construction Attorney ▬▬▬▬▬▬▬▬▬▬▬▬ FAIR•LAW•PLLC ▬▬▬▬▬▬▬▬▬▬▬▬ 13046 Racetrack Road #236 Tampa, FL 33626 (813) 412-1077 phone (877) 879-4990 fax www.fairconstructionliens.com cid:image001.jpg@01CC8816.941390B0 The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.
TR
Timothy R. Moorhead
Thu, May 31, 2012 9:02 PM

I concur.  Also, the  “fabricator” may be a Materialman if they are not installing the shutters in which case your client is out of the box because they do not meet the definition of a Lienor either as a Subcontractor or Materialman.

Since your client supplies no labor, they can only possibly be a Materialman.  However, they did not supply their materials “on” the site of the improvement or “for direct delivery” since fabrication would seem to kill that position.  What’s left is the “specially fabricated” exception to delivery to qualify.  Without something making the aluminum unique to the particular project such as color or some other quality, perhaps a particular finish or dimension that is somehow unusual, I think you would be dead in the water.  Just keeping track of where it goes is not going to be enough.

Timothy R. Moorhead, Esq.

Wright, Fulford, Moorhead & Brown, P.A.

505 Maitland Avenue

Suite 1000

Altamonte Springs, FL 32701

(407) 425-0234

(407) 425-0260 (fax)

Board Certified in Construction Law

tmoorhead@wfmblaw.com

www.wfmblaw.com

CONFIDENTIALITY NOTICE: This e-mail transmission (and/or the attachments accompanying it) may contain confidential information belonging to the sender which is protected by the attorney-client privilege. The information is intended only for the use of the intended recipient. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the contents of this information is strictly prohibited. Any unauthorized interception of this transmission is illegal. If you have received this transmission in error, please promptly notify the sender by reply e-mail, and then destroy all copies of the transmission.

IRS CIRCULAR 230 NOTICE:  To ensure compliance with recently enacted U.S. Treasury Department regulations, we hereby advise you that, unless otherwise expressly stated, any and all tax advice contained in this communication has neither been written nor intended by the sender or this firm for the use of any taxpayer for the purpose of evading or avoiding tax penalties that may be imposed pursuant to U.S. law.  Furthermore, unless otherwise expressly indicated, the use of any tax advice contained in this communication has neither been written nor intended by the sender or this firm for the purpose of promoting, marketing, or recommending a partnership or other entity, investment plan or arrangement to any taxpayer, and such taxpayer should seek advice on the taxpayer’s particular circumstances from an independent tax advisor.

Replies Filtered:  Any incoming reply to this e-mail communication or other e-mail communication to us will be electronically filtered for "spam" and/or "viruses." That filtering process may result in such reply or other e-mail communications to us being quarantined (i.e., potentially not received at our site at all) and/or delayed in reaching us. For that reason, we cannot guarantee that we will receive your reply or other e-mail communications to us and/or that we will receive the same in a timely manner. Accordingly, you should consider sending communications to us which are particularly important or time-sensitive by means other than e-mail.


From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair
Sent: Thursday, May 31, 2012 2:44 PM
To: clc-discussion@lists.flabarrpptl.org
Subject: [CLC-Discussion] question re: supplier furnishing materials tofabricator's warehouse

I have a client who is a supplier.  He furnishes aluminum to a fabricator at the fabricator’s warehouse.  After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements.  My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC.  He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply).  However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.?  I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights.  Thank you all for your input.  -Andrea

Andrea M. Fair-Purcell

Board Certified Construction Attorney

▬▬▬▬▬▬▬▬▬▬▬▬

FAIR•LAW•PLLC

▬▬▬▬▬▬▬▬▬▬▬▬

13046 Racetrack Road #236

Tampa, FL 33626
(813) 412-1077 phone

(877) 879-4990 fax
www.fairconstructionliens.com

cid:image001.jpg@01CC8816.941390B0

The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.

I concur. Also, the “fabricator” may be a Materialman if they are not installing the shutters in which case your client is out of the box because they do not meet the definition of a Lienor either as a Subcontractor or Materialman. Since your client supplies no labor, they can only possibly be a Materialman. However, they did not supply their materials “on” the site of the improvement or “for direct delivery” since fabrication would seem to kill that position. What’s left is the “specially fabricated” exception to delivery to qualify. Without something making the aluminum unique to the particular project such as color or some other quality, perhaps a particular finish or dimension that is somehow unusual, I think you would be dead in the water. Just keeping track of where it goes is not going to be enough. Timothy R. Moorhead, Esq. Wright, Fulford, Moorhead & Brown, P.A. 505 Maitland Avenue Suite 1000 Altamonte Springs, FL 32701 (407) 425-0234 (407) 425-0260 (fax) Board Certified in Construction Law tmoorhead@wfmblaw.com www.wfmblaw.com CONFIDENTIALITY NOTICE: This e-mail transmission (and/or the attachments accompanying it) may contain confidential information belonging to the sender which is protected by the attorney-client privilege. The information is intended only for the use of the intended recipient. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the contents of this information is strictly prohibited. Any unauthorized interception of this transmission is illegal. If you have received this transmission in error, please promptly notify the sender by reply e-mail, and then destroy all copies of the transmission. IRS CIRCULAR 230 NOTICE: To ensure compliance with recently enacted U.S. Treasury Department regulations, we hereby advise you that, unless otherwise expressly stated, any and all tax advice contained in this communication has neither been written nor intended by the sender or this firm for the use of any taxpayer for the purpose of evading or avoiding tax penalties that may be imposed pursuant to U.S. law. Furthermore, unless otherwise expressly indicated, the use of any tax advice contained in this communication has neither been written nor intended by the sender or this firm for the purpose of promoting, marketing, or recommending a partnership or other entity, investment plan or arrangement to any taxpayer, and such taxpayer should seek advice on the taxpayer’s particular circumstances from an independent tax advisor. Replies Filtered: Any incoming reply to this e-mail communication or other e-mail communication to us will be electronically filtered for "spam" and/or "viruses." That filtering process may result in such reply or other e-mail communications to us being quarantined (i.e., potentially not received at our site at all) and/or delayed in reaching us. For that reason, we cannot guarantee that we will receive your reply or other e-mail communications to us and/or that we will receive the same in a timely manner. Accordingly, you should consider sending communications to us which are particularly important or time-sensitive by means other than e-mail. _____ From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair Sent: Thursday, May 31, 2012 2:44 PM To: clc-discussion@lists.flabarrpptl.org Subject: [CLC-Discussion] question re: supplier furnishing materials tofabricator's warehouse I have a client who is a supplier. He furnishes aluminum to a fabricator at the fabricator’s warehouse. After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements. My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC. He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply). However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.? I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights. Thank you all for your input. -Andrea Andrea M. Fair-Purcell Board Certified Construction Attorney ▬▬▬▬▬▬▬▬▬▬▬▬ FAIR•LAW•PLLC ▬▬▬▬▬▬▬▬▬▬▬▬ 13046 Racetrack Road #236 Tampa, FL 33626 (813) 412-1077 phone (877) 879-4990 fax www.fairconstructionliens.com cid:image001.jpg@01CC8816.941390B0 The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.
RE
Robert E. Doan
Thu, May 31, 2012 9:42 PM

I have looked at an almost identical situation for a client at length awhile back.  I believe my conclusion was that you cannot do anything to preserver lien rights that cannot, by statute, exist in the first place.  We revised their contract/purchase order terms to create other ways to secure payment.

One option we explored was creating an LLC that bascially incorporated the entire supply chain from raw material to finished product which could be shipped directly to job sites, thus qualifying that entity as a material supplier.  This obviously only works where the relevant entities do enough business together to make this make sense.

Robert E. Doan
Board Certified Construction Attorney
Supreme Court Certified Circuit Civil Mediator
Silverman, Vorhis & Doan
311 NE 1st Street
Gainesville, FL 32601
PH: 352-337-8373
Fax: 352-505-6188
Email: robert@lawgainesville.com
[cid:image002.gif@01CD3F54.B3504F40]
**This communication is intended for the sole use of the individual to whom
it is addressed and may contain information that is privileged, confidential
and exempt from disclosure under applicable law.  If the reader of the
communication is not the intended recipient, or the employee or agent for
delivering the communication to the intended recipient, you are hereby
notified that any dissemination, distribution, or copying of this
communication may be strictly prohibited.  If you receive this communication
in error, please notify the sender immediately by telephone call.  Thank
you.

From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair
Sent: Thursday, May 31, 2012 2:44 PM
To: clc-discussion@lists.flabarrpptl.org
Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse

I have a client who is a supplier.  He furnishes aluminum to a fabricator at the fabricator’s warehouse.  After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements.  My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC.  He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply).  However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.?  I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights.  Thank you all for your input.  -Andrea

Andrea M. Fair-Purcell
Board Certified Construction Attorney
▬▬▬▬▬▬▬▬▬▬▬▬
FAIR•LAW•PLLC
▬▬▬▬▬▬▬▬▬▬▬▬
13046 Racetrack Road #236
Tampa, FL 33626
(813) 412-1077 phone
(877) 879-4990 fax
www.fairconstructionliens.comhttp://www.fairconstructionliens.com

[cid:image003.jpg@01CD3F54.B3504F40]

The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.

I have looked at an almost identical situation for a client at length awhile back. I believe my conclusion was that you cannot do anything to preserver lien rights that cannot, by statute, exist in the first place. We revised their contract/purchase order terms to create other ways to secure payment. One option we explored was creating an LLC that bascially incorporated the entire supply chain from raw material to finished product which could be shipped directly to job sites, thus qualifying that entity as a material supplier. This obviously only works where the relevant entities do enough business together to make this make sense. Robert E. Doan Board Certified Construction Attorney Supreme Court Certified Circuit Civil Mediator Silverman, Vorhis & Doan 311 NE 1st Street Gainesville, FL 32601 PH: 352-337-8373 Fax: 352-505-6188 Email: robert@lawgainesville.com [cid:image002.gif@01CD3F54.B3504F40] **This communication is intended for the sole use of the individual to whom it is addressed and may contain information that is privileged, confidential and exempt from disclosure under applicable law. If the reader of the communication is not the intended recipient, or the employee or agent for delivering the communication to the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication may be strictly prohibited. If you receive this communication in error, please notify the sender immediately by telephone call. Thank you. From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair Sent: Thursday, May 31, 2012 2:44 PM To: clc-discussion@lists.flabarrpptl.org Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse I have a client who is a supplier. He furnishes aluminum to a fabricator at the fabricator’s warehouse. After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements. My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC. He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply). However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.? I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights. Thank you all for your input. -Andrea Andrea M. Fair-Purcell Board Certified Construction Attorney ▬▬▬▬▬▬▬▬▬▬▬▬ FAIR•LAW•PLLC ▬▬▬▬▬▬▬▬▬▬▬▬ 13046 Racetrack Road #236 Tampa, FL 33626 (813) 412-1077 phone (877) 879-4990 fax www.fairconstructionliens.com<http://www.fairconstructionliens.com> [cid:image003.jpg@01CD3F54.B3504F40] The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.
FD
fred.dudley (at) hklaw.com
Fri, Jun 1, 2012 1:25 AM

Absent proof of delivery of the aluminum stock directly to the job site of the property to be liened the supplier lienor does not have the benefit of the statutory presumption of "incorporation"...one of the essential elements of proof in a lien foreclosure action. So, unless the supplier has some direct proof that its materials were ACTUALLY incorporated (like manhole covers with the manuf name forged into it, etc.) the supplier will be unable to prevail and is left to an adverse award of atty fees (and a possible malpractice claim agt its atty).

Frederick Dudley | Holland & Knight
Board Certified Construction Lawyer
315 South Calhoun Street, Suite 600 | Tallahassee FL 32301

Phone 850.425.5668 | Fax 850.224.8832 | Cell 850.294.3471

fred.dudley@hklaw.com mailto:fred.dudley@hklaw.com | www.hklaw.com http://www.hklaw.com/

Sent from my BlackBerry Wireless Handheld

From: Fred Barnes [mailto:Fred@fcbarneslaw.com]
Sent: Thursday, May 31, 2012 03:59 PM
To: 'Larry Leiby' Leiby@mkpalaw.com; 'Ryan P. Hatler' rhatler@cphlaw.com; 'Andrea Fair' amf@fairconstructionliens.com; clc-discussion@lists.flabarrpptl.org clc-discussion@lists.flabarrpptl.org
Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse

This is definitely one that calls for Barry Kalmanson to weigh in, but he’s on vacation.

FREDERICK C. BARNES, ESQ.
500 North Maitland Avenue, Suite 305
Maitland, Florida  32751
Telephone:  407-865-9200
Facsimile:  407-865-9209
www.fcbarneslaw.commailto:www.fcbarneslaw.com

From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby
Sent: Thursday, May 31, 2012 3:31 PM
To: Ryan P. Hatler; Andrea Fair; clc-discussion@lists.flabarrpptl.org
Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse

I don’t have a case at the tip of my tongue but the words in the definition of materialman are what give me significant pause.  Tracking the materials down later does not seem to comport with the statute.  That is why suppliers put job sites on counter pick up orders.

Larry R. Leiby, Esq.
Malka & Kravitz, P.A.
1300 Sawgrass Corp. Pkwy., Suite 100
Ft. Lauderdale, FL  33323
Phone:  954-514-0984
Fax:      954-514-0985    e-mail:  leiby@mkpalaw.com

Board Certified in Construction Law
Fla. Supreme Court Certified Circuit Court Civil Mediator

Member, Leiby Alexander Brandt ADR Group, LLC
Member, JAMS Global Engineering and Construction Panel
Fellow, College of Commercial Arbitrators

[Description: JAMSadr.com.jpg]

From: Ryan P. Hatler [mailto:rhatler@cphlaw.com]
Sent: Thursday, May 31, 2012 3:21 PM
To: Larry Leiby; Andrea Fair; clc-discussion@lists.flabarrpptl.org
Subject: RE: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse

Wouldn’t the affidavit she prepared and the process she describes below to have her client track the material to particular job sites be sufficient to satisfy the requirements of the statute?

From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby
Sent: Thursday, May 31, 2012 2:08 PM
To: Andrea Fair; clc-discussion@lists.flabarrpptl.org
Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse

A Materialman who does not deliver to the site or sell for direct delivery to the site is not a materialman who has lien rights.  See F.S. 713.01 (20).  A materialman who sells to a fabricator with no understanding that the materials are for a specific site has a problem with the definition of a lienor.

Larry R. Leiby, Esq.
Malka & Kravitz, P.A.
1300 Sawgrass Corp. Pkwy., Suite 100
Ft. Lauderdale, FL  33323
Phone:  954-514-0984
Fax:      954-514-0985    e-mail:  leiby@mkpalaw.commailto:leiby@mkpalaw.com

Board Certified in Construction Law
Fla. Supreme Court Certified Circuit Court Civil Mediator

Member, Leiby Alexander Brandt ADR Group, LLC
Member, JAMS Global Engineering and Construction Panel
Fellow, College of Commercial Arbitrators

[Description: JAMSadr.com.jpg]

From: clc-discussion-bounces@lists.flabarrpptl.orgmailto:clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair
Sent: Thursday, May 31, 2012 2:44 PM
To: clc-discussion@lists.flabarrpptl.orgmailto:clc-discussion@lists.flabarrpptl.org
Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse

I have a client who is a supplier.  He furnishes aluminum to a fabricator at the fabricator’s warehouse.  After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements.  My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC.  He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply).  However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.?  I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights.  Thank you all for your input.  -Andrea

Andrea M. Fair-Purcell
Board Certified Construction Attorney
▬▬▬▬▬▬▬▬▬▬▬▬
FAIR•LAW•PLLC
▬▬▬▬▬▬▬▬▬▬▬▬
13046 Racetrack Road #236
Tampa, FL 33626
(813) 412-1077 phone
(877) 879-4990 fax
www.fairconstructionliens.comhttp://www.fairconstructionliens.com

[cid:image001.jpg@01CC8816.941390B0]

The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.


IRS CIRCULAR 230 DISCLOSURE: TO ENSURE COMPLIANCE WITH REQUIREMENTS IMPOSED BY THE IRS, WE INFORM YOU THAT ANY TAX ADVICE CONTAINED IN THIS COMMUNICATION (INCLUDING ANY ATTACHMENTS) IS NOT INTENDED OR WRITTEN BY HOLLAND & KNIGHT LLP TO BE USED, AND CANNOT BE USED, FOR THE PURPOSE OF (I) AVOIDING TAX-RELATED PENALTIES UNDER THE INTERNAL REVENUE CODE, OR (II) PROMOTING, MARKETING, OR RECOMMENDING TO ANOTHER PARTY ANY TAX-RELATED MATTER HEREIN.


NOTE: This e-mail is from a law firm, Holland & Knight LLP (“H&K”), and is intended solely for the use of the individual(s) to whom it is addressed. If you believe you received this e-mail in error, please notify the sender immediately, delete the e-mail from your computer and do not copy or disclose it to anyone else. If you are not an existing client of H&K, do not construe anything in this e-mail to make you a client unless it contains a specific statement to that effect and do not disclose anything to H&K in reply that you expect it to hold in confidence. If you properly received this e-mail as a client, co-counsel or retained expert of H&K, you should maintain its contents in confidence in order to preserve the attorney-client or work product privilege that may be available to protect confidentiality.

Absent proof of delivery of the aluminum stock directly to the job site of the property to be liened the supplier lienor does not have the benefit of the statutory presumption of "incorporation"...one of the essential elements of proof in a lien foreclosure action. So, unless the supplier has some direct proof that its materials were ACTUALLY incorporated (like manhole covers with the manuf name forged into it, etc.) the supplier will be unable to prevail and is left to an adverse award of atty fees (and a possible malpractice claim agt its atty). Frederick Dudley | Holland & Knight Board Certified Construction Lawyer 315 South Calhoun Street, Suite 600 | Tallahassee FL 32301 Phone 850.425.5668 | Fax 850.224.8832 | Cell 850.294.3471 fred.dudley@hklaw.com <mailto:fred.dudley@hklaw.com> | www.hklaw.com <http://www.hklaw.com/> -------------------------- Sent from my BlackBerry Wireless Handheld From: Fred Barnes [mailto:Fred@fcbarneslaw.com] Sent: Thursday, May 31, 2012 03:59 PM To: 'Larry Leiby' <Leiby@mkpalaw.com>; 'Ryan P. Hatler' <rhatler@cphlaw.com>; 'Andrea Fair' <amf@fairconstructionliens.com>; clc-discussion@lists.flabarrpptl.org <clc-discussion@lists.flabarrpptl.org> Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse This is definitely one that calls for Barry Kalmanson to weigh in, but he’s on vacation. FREDERICK C. BARNES, ESQ. 500 North Maitland Avenue, Suite 305 Maitland, Florida 32751 Telephone: 407-865-9200 Facsimile: 407-865-9209 www.fcbarneslaw.com<mailto:www.fcbarneslaw.com> From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby Sent: Thursday, May 31, 2012 3:31 PM To: Ryan P. Hatler; Andrea Fair; clc-discussion@lists.flabarrpptl.org Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse I don’t have a case at the tip of my tongue but the words in the definition of materialman are what give me significant pause. Tracking the materials down later does not seem to comport with the statute. That is why suppliers put job sites on counter pick up orders. Larry R. Leiby, Esq. Malka & Kravitz, P.A. 1300 Sawgrass Corp. Pkwy., Suite 100 Ft. Lauderdale, FL 33323 Phone: 954-514-0984 Fax: 954-514-0985 e-mail: leiby@mkpalaw.com Board Certified in Construction Law Fla. Supreme Court Certified Circuit Court Civil Mediator Member, Leiby Alexander Brandt ADR Group, LLC Member, JAMS Global Engineering and Construction Panel Fellow, College of Commercial Arbitrators [Description: JAMSadr.com.jpg] From: Ryan P. Hatler [mailto:rhatler@cphlaw.com] Sent: Thursday, May 31, 2012 3:21 PM To: Larry Leiby; Andrea Fair; clc-discussion@lists.flabarrpptl.org Subject: RE: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse Wouldn’t the affidavit she prepared and the process she describes below to have her client track the material to particular job sites be sufficient to satisfy the requirements of the statute? From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby Sent: Thursday, May 31, 2012 2:08 PM To: Andrea Fair; clc-discussion@lists.flabarrpptl.org Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse A Materialman who does not deliver to the site or sell for direct delivery to the site is not a materialman who has lien rights. See F.S. 713.01 (20). A materialman who sells to a fabricator with no understanding that the materials are for a specific site has a problem with the definition of a lienor. Larry R. Leiby, Esq. Malka & Kravitz, P.A. 1300 Sawgrass Corp. Pkwy., Suite 100 Ft. Lauderdale, FL 33323 Phone: 954-514-0984 Fax: 954-514-0985 e-mail: leiby@mkpalaw.com<mailto:leiby@mkpalaw.com> Board Certified in Construction Law Fla. Supreme Court Certified Circuit Court Civil Mediator Member, Leiby Alexander Brandt ADR Group, LLC Member, JAMS Global Engineering and Construction Panel Fellow, College of Commercial Arbitrators [Description: JAMSadr.com.jpg] From: clc-discussion-bounces@lists.flabarrpptl.org<mailto:clc-discussion-bounces@lists.flabarrpptl.org> [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair Sent: Thursday, May 31, 2012 2:44 PM To: clc-discussion@lists.flabarrpptl.org<mailto:clc-discussion@lists.flabarrpptl.org> Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse I have a client who is a supplier. He furnishes aluminum to a fabricator at the fabricator’s warehouse. After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements. My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC. He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply). However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.? I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights. Thank you all for your input. -Andrea Andrea M. Fair-Purcell Board Certified Construction Attorney ▬▬▬▬▬▬▬▬▬▬▬▬ FAIR•LAW•PLLC ▬▬▬▬▬▬▬▬▬▬▬▬ 13046 Racetrack Road #236 Tampa, FL 33626 (813) 412-1077 phone (877) 879-4990 fax www.fairconstructionliens.com<http://www.fairconstructionliens.com> [cid:image001.jpg@01CC8816.941390B0] The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments. ________________________________ ****IRS CIRCULAR 230 DISCLOSURE: TO ENSURE COMPLIANCE WITH REQUIREMENTS IMPOSED BY THE IRS, WE INFORM YOU THAT ANY TAX ADVICE CONTAINED IN THIS COMMUNICATION (INCLUDING ANY ATTACHMENTS) IS NOT INTENDED OR WRITTEN BY HOLLAND & KNIGHT LLP TO BE USED, AND CANNOT BE USED, FOR THE PURPOSE OF (I) AVOIDING TAX-RELATED PENALTIES UNDER THE INTERNAL REVENUE CODE, OR (II) PROMOTING, MARKETING, OR RECOMMENDING TO ANOTHER PARTY ANY TAX-RELATED MATTER HEREIN.**** ________________________________ NOTE: This e-mail is from a law firm, Holland & Knight LLP (“H&K”), and is intended solely for the use of the individual(s) to whom it is addressed. If you believe you received this e-mail in error, please notify the sender immediately, delete the e-mail from your computer and do not copy or disclose it to anyone else. If you are not an existing client of H&K, do not construe anything in this e-mail to make you a client unless it contains a specific statement to that effect and do not disclose anything to H&K in reply that you expect it to hold in confidence. If you properly received this e-mail as a client, co-counsel or retained expert of H&K, you should maintain its contents in confidence in order to preserve the attorney-client or work product privilege that may be available to protect confidentiality.
JL
Jim Lupino
Fri, Jun 1, 2012 11:12 AM

I had a similar situation for a metal roofing supplier. For future deliveries  - we advised our client that the best way to insure collection was COD as the lien rights were questionable.

James S. Lupino, Esquire
Hershoff Lupino & Yagel, LLP
90130 Old Highway
Tavernier, FL 33070
(305) 852-8440 - Telephone
(305) 852-8848 - Facsimile
jlupino@tropicalaw.commailto:jlupino@tropicalaw.com

CONFIDENTIALITY NOTICE:  The information contained in this e-mail message is intended for the personal and confidential use of the recipient(s) designated above.  This message may contain information that is protected by the attorney/client privilege, and/or some other legal privilege, and any unauthorized or inadvertent use, receipt, disclosure, dissemination or distribution of such information shall not waive any such privilege.  If you are not an intended recipient of this message, and/or you have received this message in error, then please notify the sender at (305) 852-8440.  Any unauthorized and/or unintended review, use, dissemination, distribution or reproduction of this message, or any of the information contained in it, is strictly prohibited.
From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby
Sent: Thursday, May 31, 2012 3:31 PM
To: Ryan P. Hatler; Andrea Fair; clc-discussion@lists.flabarrpptl.org
Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse

I don’t have a case at the tip of my tongue but the words in the definition of materialman are what give me significant pause.  Tracking the materials down later does not seem to comport with the statute.  That is why suppliers put job sites on counter pick up orders.

Larry R. Leiby, Esq.
Malka & Kravitz, P.A.
1300 Sawgrass Corp. Pkwy., Suite 100
Ft. Lauderdale, FL  33323
Phone:  954-514-0984
Fax:      954-514-0985    e-mail:  leiby@mkpalaw.commailto:leiby@mkpalaw.com

Board Certified in Construction Law
Fla. Supreme Court Certified Circuit Court Civil Mediator

Member, Leiby Alexander Brandt ADR Group, LLC
Member, JAMS Global Engineering and Construction Panel
Fellow, College of Commercial Arbitrators

[cid:image001.jpg@01CD3FC5.E1BCB3C0]

From: Ryan P. Hatler [mailto:rhatler@cphlaw.com]mailto:[mailto:rhatler@cphlaw.com]
Sent: Thursday, May 31, 2012 3:21 PM
To: Larry Leiby; Andrea Fair; clc-discussion@lists.flabarrpptl.orgmailto:clc-discussion@lists.flabarrpptl.org
Subject: RE: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse

Wouldn’t the affidavit she prepared and the process she describes below to have her client track the material to particular job sites be sufficient to satisfy the requirements of the statute?

From: clc-discussion-bounces@lists.flabarrpptl.orgmailto:clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org]mailto:[mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby
Sent: Thursday, May 31, 2012 2:08 PM
To: Andrea Fair; clc-discussion@lists.flabarrpptl.orgmailto:clc-discussion@lists.flabarrpptl.org
Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse

A Materialman who does not deliver to the site or sell for direct delivery to the site is not a materialman who has lien rights.  See F.S. 713.01 (20).  A materialman who sells to a fabricator with no understanding that the materials are for a specific site has a problem with the definition of a lienor.

Larry R. Leiby, Esq.
Malka & Kravitz, P.A.
1300 Sawgrass Corp. Pkwy., Suite 100
Ft. Lauderdale, FL  33323
Phone:  954-514-0984
Fax:      954-514-0985    e-mail:  leiby@mkpalaw.commailto:leiby@mkpalaw.com

Board Certified in Construction Law
Fla. Supreme Court Certified Circuit Court Civil Mediator

Member, Leiby Alexander Brandt ADR Group, LLC
Member, JAMS Global Engineering and Construction Panel
Fellow, College of Commercial Arbitrators

[cid:image001.jpg@01CD3FC5.E1BCB3C0]

From: clc-discussion-bounces@lists.flabarrpptl.orgmailto:clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair
Sent: Thursday, May 31, 2012 2:44 PM
To: clc-discussion@lists.flabarrpptl.orgmailto:clc-discussion@lists.flabarrpptl.org
Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse

I have a client who is a supplier.  He furnishes aluminum to a fabricator at the fabricator’s warehouse.  After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements.  My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC.  He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply).  However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.?  I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights.  Thank you all for your input.  -Andrea

Andrea M. Fair-Purcell
Board Certified Construction Attorney
▬▬▬▬▬▬▬▬▬▬▬▬
FAIR•LAW•PLLC
▬▬▬▬▬▬▬▬▬▬▬▬
13046 Racetrack Road #236
Tampa, FL 33626
(813) 412-1077 phone
(877) 879-4990 fax
www.fairconstructionliens.comhttp://www.fairconstructionliens.com

[cid:image002.jpg@01CD3FC5.E1BCB3C0]

The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.

I had a similar situation for a metal roofing supplier. For future deliveries - we advised our client that the best way to insure collection was COD as the lien rights were questionable. James S. Lupino, Esquire Hershoff Lupino & Yagel, LLP 90130 Old Highway Tavernier, FL 33070 (305) 852-8440 - Telephone (305) 852-8848 - Facsimile jlupino@tropicalaw.com<mailto:jlupino@tropicalaw.com> CONFIDENTIALITY NOTICE: The information contained in this e-mail message is intended for the personal and confidential use of the recipient(s) designated above. This message may contain information that is protected by the attorney/client privilege, and/or some other legal privilege, and any unauthorized or inadvertent use, receipt, disclosure, dissemination or distribution of such information shall not waive any such privilege. If you are not an intended recipient of this message, and/or you have received this message in error, then please notify the sender at (305) 852-8440. Any unauthorized and/or unintended review, use, dissemination, distribution or reproduction of this message, or any of the information contained in it, is strictly prohibited. From: clc-discussion-bounces@lists.flabarrpptl.org [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Larry Leiby Sent: Thursday, May 31, 2012 3:31 PM To: Ryan P. Hatler; Andrea Fair; clc-discussion@lists.flabarrpptl.org Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse I don’t have a case at the tip of my tongue but the words in the definition of materialman are what give me significant pause. Tracking the materials down later does not seem to comport with the statute. That is why suppliers put job sites on counter pick up orders. Larry R. Leiby, Esq. Malka & Kravitz, P.A. 1300 Sawgrass Corp. Pkwy., Suite 100 Ft. Lauderdale, FL 33323 Phone: 954-514-0984 Fax: 954-514-0985 e-mail: leiby@mkpalaw.com<mailto:leiby@mkpalaw.com> Board Certified in Construction Law Fla. Supreme Court Certified Circuit Court Civil Mediator Member, Leiby Alexander Brandt ADR Group, LLC Member, JAMS Global Engineering and Construction Panel Fellow, College of Commercial Arbitrators [cid:image001.jpg@01CD3FC5.E1BCB3C0] From: Ryan P. Hatler [mailto:rhatler@cphlaw.com]<mailto:[mailto:rhatler@cphlaw.com]> Sent: Thursday, May 31, 2012 3:21 PM To: Larry Leiby; Andrea Fair; clc-discussion@lists.flabarrpptl.org<mailto:clc-discussion@lists.flabarrpptl.org> Subject: RE: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse Wouldn’t the affidavit she prepared and the process she describes below to have her client track the material to particular job sites be sufficient to satisfy the requirements of the statute? From: clc-discussion-bounces@lists.flabarrpptl.org<mailto:clc-discussion-bounces@lists.flabarrpptl.org> [mailto:clc-discussion-bounces@lists.flabarrpptl.org]<mailto:[mailto:clc-discussion-bounces@lists.flabarrpptl.org]> On Behalf Of Larry Leiby Sent: Thursday, May 31, 2012 2:08 PM To: Andrea Fair; clc-discussion@lists.flabarrpptl.org<mailto:clc-discussion@lists.flabarrpptl.org> Subject: Re: [CLC-Discussion] question re: supplier furnishing materialsto fabricator's warehouse A Materialman who does not deliver to the site or sell for direct delivery to the site is not a materialman who has lien rights. See F.S. 713.01 (20). A materialman who sells to a fabricator with no understanding that the materials are for a specific site has a problem with the definition of a lienor. Larry R. Leiby, Esq. Malka & Kravitz, P.A. 1300 Sawgrass Corp. Pkwy., Suite 100 Ft. Lauderdale, FL 33323 Phone: 954-514-0984 Fax: 954-514-0985 e-mail: leiby@mkpalaw.com<mailto:leiby@mkpalaw.com> Board Certified in Construction Law Fla. Supreme Court Certified Circuit Court Civil Mediator Member, Leiby Alexander Brandt ADR Group, LLC Member, JAMS Global Engineering and Construction Panel Fellow, College of Commercial Arbitrators [cid:image001.jpg@01CD3FC5.E1BCB3C0] From: clc-discussion-bounces@lists.flabarrpptl.org<mailto:clc-discussion-bounces@lists.flabarrpptl.org> [mailto:clc-discussion-bounces@lists.flabarrpptl.org] On Behalf Of Andrea Fair Sent: Thursday, May 31, 2012 2:44 PM To: clc-discussion@lists.flabarrpptl.org<mailto:clc-discussion@lists.flabarrpptl.org> Subject: [CLC-Discussion] question re: supplier furnishing materials to fabricator's warehouse I have a client who is a supplier. He furnishes aluminum to a fabricator at the fabricator’s warehouse. After the aluminum is fabricated into hurricane shutters, the materials are then delivered to various jobsites for incorporation into the improvements. My client hasn’t been paid so, for all future deliveries, I have prepared an Affidavit for the fabricator to sign, testifying where the materials are going, who he has a contract with, who the GC is, who the owner is, and attaching the NOC. He also knows he will need to monitor the situation to make sure the materials are actually delivered to and incorporated into the improvements (assuming the exception re: specially fabricated materials doesn’t apply). However, for the materials my client has already furnished and which have already been fabricated and incorporated into the improvements, is there any method or mechanism to demand that information from the fabricator so my client can possibly preserve his lien rights, serve a NTO, record a lien, etc.? I know I can sue the fabricator and get the info via discovery but that will take too long for purposes of trying to preserve lien rights. Thank you all for your input. -Andrea Andrea M. Fair-Purcell Board Certified Construction Attorney ▬▬▬▬▬▬▬▬▬▬▬▬ FAIR•LAW•PLLC ▬▬▬▬▬▬▬▬▬▬▬▬ 13046 Racetrack Road #236 Tampa, FL 33626 (813) 412-1077 phone (877) 879-4990 fax www.fairconstructionliens.com<http://www.fairconstructionliens.com> [cid:image002.jpg@01CD3FC5.E1BCB3C0] The contents of this e-mail message and any attachments are intended solely for the addressee(s) named in this e-mail message. This communication is intended to be and to remain confidential and may be subject to applicable attorney/client and/or work product privileges. If you are not the intended recipient of this e-mail message, or if this e-mail message has been addressed to you in error, please immediately alert the sender by reply e-mail and then delete this e-mail message and its attachments. Do not deliver, distribute or copy this e-mail message and/or any attachments and if you are not the intended recipient, do not disclose the contents or take any action in reliance upon the information contained in this communication or any attachments.